Stairwell/flyover remodelling

New disabled lift and remodelling of third floor building

Gutting and major renovation of the original building with the library moving back to take up most of the second floor there

November 16, 2002

Report - It looks like a bombsite on the lower floor inside the entrance - whole walls have gone near the general office and many of the old classrooms. I couldn't go into the construction zone where there are barricades, but these photos should give you an idea.

The prefabs containing admin and the principal's office

 

Prefabs near Prospect Hill Road

 

The courtyard is closed off

 

The Assembly Hall internal entrance is closed off

 

The old Art room is out of bounds

 

Rooms 13 and 14

 

February 3rd and 10th, 2003

Report - The old stairwell on the south side has been totally transformed - the old stair up to that pokey office has gone. No more painted concrete. Lovely heavy duty lino on the stairs and the walkway, which is now accessible to the students. The front entrance is still barred, so access is via the canteen and up the stairs to the courtyard. The Assembly Hall is full of tables and chairs for classes. Lots of portables on the end of the oval towards the adjacent tennis courts.

The main entrance with the Construction Site sign on the door

 

The chute

The hole being dug for the disabled lift

 

The new huge Common Room where Rooms 7 and 8 were

 

The new stairwell outside Room 12

 

Classes set up within the Assembly Hall

 

Refurbished Room 12 - Computer Room

 

The new Careers Centre

 

Looking towards Room 20 - the old Library. The interior walls of Rooms 16, 17, 18 and 19 have gone and the new 500 square metre Libary will occupy this space.

 

Room 20

 

Downstairs in the foyer area

 

The old office area

 

The portables on the oval

 

The old girl

 

May 16th, 2003

Report - All of downstairs is completely refurbished and it's truly magnificent. The library will be relocated to the second floor of the renovated old building in three weeks' time. Here is the new conference room.

 

The new administration office.

 

Principal's Office

 

The hallway downstairs

 

June 18th , 2003

Report - The new library is FANTASTIC!!!

 

 

 

 

 

June 18th , 2003

Report - the new disabled lift foundations....

 

 

July 18th , 2003

Report - three new classrooms emerging from the old library site on 2nd floor

July 18th , 2003

Report - the walls are well on their way..

 

August 11th , 2003

Report - the new science rooms are open.

The interior of Room 203

 

September 8th , 2003

Report - the exterior of the disabled lift.

October 13th , 2003

Report - the fantastic new Home Economics rooms

 

The second large Home Eco room

The servery exterior in the Assembly Hall foyer

Interior of the servery...fridge yet to come

 

Terrific new girls' loos...

 

The flyover/workmen's area

 

The new Japanese garden near the laneway