Stairwell/flyover remodelling
New disabled lift and remodelling of third floor building
Gutting and major renovation of the original building with the library moving back to take up most of the second floor there
November 16, 2002 Report - It looks like a bombsite on the lower floor inside the entrance - whole walls have gone near the general office and many of the old classrooms. I couldn't go into the construction zone where there are barricades, but these photos should give you an idea. The prefabs containing admin and the principal's office
|
Prefabs near Prospect Hill Road
|
The courtyard is closed off
|
The Assembly Hall internal entrance is closed off
|
The old Art room is out of bounds
|
Rooms 13 and 14
|
February 3rd and 10th, 2003 Report - The old stairwell on the south side has been totally transformed - the old stair up to that pokey office has gone. No more painted concrete. Lovely heavy duty lino on the stairs and the walkway, which is now accessible to the students. The front entrance is still barred, so access is via the canteen and up the stairs to the courtyard. The Assembly Hall is full of tables and chairs for classes. Lots of portables on the end of the oval towards the adjacent tennis courts. The main entrance with the Construction Site sign on the door
|
The chute The hole being dug for the disabled lift
|
The new huge Common Room where Rooms 7 and 8 were
|
The new stairwell outside Room 12
|
Classes set up within the Assembly Hall
|
Refurbished Room 12 - Computer Room
|
The new Careers Centre
|
Looking towards Room 20 - the old Library. The interior walls of Rooms 16, 17, 18 and 19 have gone and the new 500 square metre Libary will occupy this space.
|
Room 20
|
Downstairs in the foyer area
|
The old office area
|
The portables on the oval
|
The old girl |
May 16th, 2003 Report - All of downstairs is completely refurbished and it's truly magnificent. The library will be relocated to the second floor of the renovated old building in three weeks' time. Here is the new conference room. |
The new administration office. |
Principal's Office |
The hallway downstairs |
June 18th , 2003 Report - The new library is FANTASTIC!!! |
|
|
|
|
June 18th , 2003 Report - the new disabled lift foundations....
|
July 18th , 2003 Report - three new classrooms emerging from the old library site on 2nd floor |
July 18th , 2003 Report - the walls are well on their way..
|
August 11th , 2003 Report - the new science rooms are open. |
The interior of Room 203 |
|
September 8th , 2003 Report - the exterior of the disabled lift. |
October 13th , 2003 Report - the fantastic new Home Economics rooms |
|
The second large Home Eco room |
The servery exterior in the Assembly Hall foyer |
Interior of the servery...fridge yet to come |
Terrific new girls' loos... |
The flyover/workmen's area |
The new Japanese garden near the laneway |
©CHESS 2001