Cudgegong Road Station

In the heart of the North West Growth Centre, the new Cudgegong Road Station will become the transport hub for booming residential growth at 
The Ponds, Rouse Hill and surrounding areas.

Main station features

Parking

1000 commuter spaces

Kiss and ride

15 spaces

Buses

6 bus bays

Taxis 

9 spaces

Bicycles

Parking and storage for 45 bicycles

It is an open cut station – that is, open to the sky, but about six metres below street level. A canopy will cover part of the platform for shade.

Access and entry

Station access and entry is via a new access road on the northern side of the station, between Cudgegong Road and Tallawong Road. The station entrance and concourse is located at street level on the northern side, establishing a public forecourt for a future village centre.

There will be a strong emphasis on pedestrian access at the station and a dedicated pedestrian bridge across the rail line will provide direct connections to the local shops and commercial activities.

New features:

  • Two new internal access roads between Tallawong Road and Cudgegong Road, providing access to the station and car park areas
  • Construction of a road overbridge midway between Tallawong Road and Cudgegong Road linking 
the access roads
  • New traffic lights off Cudgegong Road and Tallawong Road 

  • Pedestrian bridge across the rail line
  • Weather protected kiss-and-ride, bus and taxi areas
  • Access for emergency, delivery and maintenance vehicles.


      Location

      The station is located parallel to Schofields Road between Cudgegong Road and Tallawong Road. Cudgegong Road Station is 48 kilometres north west of Sydney central business district (CBD).

      Indicative travel time

      • 57 minutes (including interchange) to Wynyard Station
      • 48 minutes to Sydney Metro’s Martin Place Station (from 2024).

      Cudgegong Road Station platform

      Cudgegong Road Station platform
      Skytrain construction at Second Ponds Creek
      Skytrain construction at Second Ponds Creek

      Skytrain construction

      Skytrain construction
      Photo of skytrain construction at Cudgegong Road
      Photo of skytrain construction at Cudgegong Road

      Gantry crane

      Gantry crane
      Cudgegong Road Station concourse artist impression
      Cudgegong Road Station concourse artist impression

      Cudgegong Road Station concourse

      Cudgegong Road Station concourse

      Station construction

      Area: 590,000 square metres (M2). 

      Construction activities include:

      • Spoil removal
      • Station construction
      • General civil works
      • Station construction and fit-out
      • Station precinct works
      • Systems fit-out
      • Testing and commissioning.

      Construction of Cudgegong Station started in late 2015.

      Construction updates

      02.01.2017
      02.01.2017
      Community Notification - traffic changes at Cudgegong Road and SMTF
      PDF | 316.33 KB
      Download
      02.01.2017
      02.01.2017
      Community Notification - SMTF and Cudgegong Road oversized deliveries and removals
      PDF | 590.62 KB
      Download
      28.12.2016
      28.12.2016
      Community Notification - SMTF and Cudgegong Road construction update
      PDF | 336.63 KB
      Download
      21.10.2016
      21.10.2016
      Community Notification - Construction update for Sydney Metro Trains Facility and Cudgegong Road Station site November to December
      PDF | 357.89 KB
      Download
      16.08.2016
      16.08.2016
      Community Notification - Cudgegong Road station and Sydney Metro Trains Facility update
      PDF | 383.03 KB
      Download

      Sydney Metro Trains Facility

      Rouse Hill Station