About the construction site
The Epping Services Facility will be used for fresh air tunnel ventilation and as an emergency point once trains start running.
Area: 12,000 square metres (m2).
Construction activities include:
- services facility construction
- tunnel systems fit-out.
Main site features
Proposed work at the site includes:
- connecting the new Sydney Metro Northwest tunnels to the existing rail network
- installation of two transformer substations and a low voltage switch room
- construction of facilities for maintenance staff.
Location
Access to the Epping Services Facility construction zone will be from:
- Beecroft Road (left in, left out)
- Ray Road (right in, left out).
Construction updates
30.03.2017 |
30.03.2017
Construction Notification - Epping Services Facility out-of-hours delivery/removal of oversized equipment
PDF | 662.48 KB
|
Download |
28.03.2017 |
28.03.2017
Construction Notification - Epping Service Facility construction update
PDF | 641.09 KB
|
Download |
06.03.2017 | Download | |
28.12.2016 |
28.12.2016
Community Notification - Epping Services Facility Construction Update
PDF | 637.06 KB
|
Download |
28.12.2016 |
28.12.2016
Community Notification - Epping Services Facility oversized deliveries and removals
PDF | 662.31 KB
|
Download |