About the construction site
Work at the construction zone involves construction of the skytrain viaduct spans and piers.
Impregilo Salini Joint Venture has been contracted to build the 4 kilometre elevated skytrain component of Sydney Metro Northwest, including a new cable stay bridge over Windsor Road at Rouse Hill.
Main site features
Area: 50,000 square metres (m2).
Construction activities include:
- Viaduct launch/support
- At-grade surface and viaduct systems fit-out
- Testing and commissioning.
Location
The site extends from Samantha Riley Drive to the Windsor Road/Old Windsor Road intersection.
Construction updates
31.01.2017 |
31.01.2017
Community notification - Temporary road closures at Windsor Road and Old Windsor Road intersections.pdf
PDF | 1.04 MB
|
Download |
25.10.2016 |
25.10.2016
Community Notification - Kellyville footbridge design investigations
PDF | 288.51 KB
|
Download |
02.08.2016 |
02.08.2016
Community Notification Out-of-hours activities – Samantha Riley Drive to Windsor Road
PDF | 478.82 KB
|
Download |