Balmoral Road will be a major construction site, providing important logistical support for the tunnel construction.

Area: 190,000 square metres (m2).

Construction activities include:

  • spoil removal
  • general civil works
  • station construction and fit-out
  • station precinct works
  • at-grade surface and viaduct systems fit-out
  • testing and commissioning.

Main site features

Balmoral Road has been a major construction site, providing important logistical support for the tunnel construction. The Balmoral site was used for nearby earthworks and also included a concrete mixing plant and pre-cast facility.
 
A temporary concrete mixing plant was established to make the circular concrete rings that form the internal linings of the tunnels. The concrete rings were manufactured in segments at Balmoral Road and then taken to work sites at Bella Vista, Showground and Cherrybrook.
 
To meet tunnelling production requirements, around 36 rings were produced each day. To support this production, 100 tonnes of cement and 500 cubic metres (m³) of sand and aggregate were delivered to the site each day.

Location

Access to the Balmoral Road construction zone will be from: 

  • Balmoral Road (left in, right out)
  • Memorial Avenue (all movements).

Construction updates

13.03.2017
13.03.2017
Community Notification - Balmoral Road Out of Hours works
PDF | 295.44 KB
Download
07.03.2017
07.03.2017
Community Notification - temporary footpath closure Old Windsor Road
PDF | 350.72 KB
Download
24.02.2017 to 24.04.2017
24.02.2017 to 24.04.2017
Community Notification - Balmoral Road Re-opening
PDF | 326.28 KB
Download
25.01.2017
25.01.2017
Community Notification - Balmoral Road continuation of temporary road closure
PDF | 339.21 KB
Download
09.01.2017
09.01.2017
Community Notification - Balmoral to Memorial footpath closure at Miami and Old Windsor Roads
PDF | 408.98 KB
Download

Cheltenham Services Facility